Saturday, February 13, 2021

Winter!

It's winter and the garage is unheated so progress has bin slow. We have had temperatures below minus 20 Celsius degrees. But I'm glad we finally have a "real" winter for a change.


Compared to February 2020 when the project was hauled home and the scenery looked completely different. Picture above is from almost same spot but from different angle.

When temperatures have been more durable some minor tasks have been attended to. Welded wheels and feet to a piece of profile that will be welded under the couch. The idea is to be able to lift from the rear bumper and move the couch on the wheels. The feet have an insert with treads that allow length adjustment of feet (inserts not shown on picture).


Temporary wheels removed and preparing for welding.


Mocked up. I was lazy when building this piece and welded everything. Future replacement of components not taken in consideration! 





Final details done and the project is now ready!

 Here are some pictures of how it turned out.